Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 12, 2019, 03:34 PM
  • H 0717_H 0716_12092019_084756.mp4

Date
09/12/2019
W/O
776981
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00941
PipeID
P11125
Time
8:34 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6958
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
LA PUENTE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_776981_TV22077_JUL2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0717
Downstream MH
H 0716
Dir. of Survey
Downstream
Length Surveyed
424.9 ft.
Total Length
424.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole H 0717 to H 0716
MH: H 0717MH: H 0716downstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start0 ft. AMH - Upstream Manhole, Survey Begins - H 07170 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - 75% MAG COAT THROUGHOUT211.8 ft. VC - Vermin Cockroach, within 8 inches of joint: YES422.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish422.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish424.9 ft. AMH - Downstream Manhole, Survey Ends - H 0716

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    0 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 75% MAG COAT THROUGHOUT

    0 ft. - General Observation - 75% MAG COAT THROUGHOUT

Observations (10)

DistanceCodeObservation
0DAGS
0AMHH 0717
424.9AMHH 0716
0MWM
0SAP
0MWL
0MGO75% MAG COAT THROUGHOUT
211.8VC
422.9SAP
422.9DAGS

Properties (6)

additional_info
SC378566
custom_field_two
3
customer
LACSD
datetime
2019-09-12T08:34:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false