H 0715_H 0714_12082019_230147.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
765.2 ft. - Material Change, Polyvinyl Chloride (PVC)
778.1 ft. - Material Change, Concrete pipe (non-reinfored)
1004.4 ft. - General Observation - RUN LIST STATES D/S MH TO BE H 0475, NO CONNECTION AT MH H 0475. ACTUAL D/S MH IS H 0714. SECTION INFO CHANGED TO REFLECT ACTUAL D/S MH.
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | — |
| 2 | SAP | — |
| 765.2 | MMC | — |
| 7.5 | MGO | MAG COATING THROUGHOUT 75% |
| 1004.4 | MGO | RUN LIST STATES D/S MH TO BE H 0475, NO CONNECTION AT MH H 0475. ACTUAL D/S MH IS H 0714. SECTION INFO CHANGED TO REFLECT ACTUAL D/S MH. |
| 1004.4 | SSS | — |
| 1004.4 | DAGS | — |
| 1004.4 | SAP | — |
| 778.1 | MMC | — |
| 0 | MWM | — |
| 1004.4 | AMH | H 0714 |
| 0 | MWL | — |
| 2 | DAGS | — |
| 764 | MGO | SMALL TEAR IN LINER @ 12 O'CLOCK |
| 0 | AMH | H 0715 |