Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2019, 06:04 AM
  • H 0714_H 0713_12082019_231840.mp4

Date
08/12/2019
W/O
776981
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00941
PipeID
P11121
Time
11:04 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6858
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
LA PUENTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_776981_TV22077_JUL2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
25 in.
Width
25 in.
Upstream MH
H 0714
Downstream MH
H 0713
Dir. of Survey
Downstream
Length Surveyed
162.7 ft.
Total Length
162.7 ft.
Structural Index
2
Structural Quick
322E
Structural Rating
70
O&M Index
2
O&M Quick
2E00
O&M Rating
64
Overall Index
2
Overall Quick
Overall Rating
134
Pipe schematic from manhole H 0714 to H 0713
MH: H 0714MH: H 0713downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 07142 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start9.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish38.9 ft. RPL - Repair Localized Liner, within 8 inches of joint: YES, Start86.5 ft. RPL - Repair Localized Liner, within 8 inches of joint: YES, Finish162.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish162.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish162.7 ft. AMH - Downstream Manhole, Survey Ends - H 0713, RUN LIST STATES MH AT 60'.

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Repair Localized Liner, within 8 inches of joint: YES, Start

    38.9 ft. - Repair Localized Liner, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
86.5RPL
162.7AMHH 0713, RUN LIST STATES MH AT 60'.
38.9RPL
162.1SSS
2.9SSS
2.9SAP
2DAGS
9.1SAP
0MWL
162.1DAGS
0MWM
0AMHH 0714

Properties (6)

additional_info
SC378327
custom_field_two
3
customer
LACSD
datetime
2019-08-12T23:04:55-07:00
documentation
PRO PIPE
is_lateral_inspection
false