Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2019, 09:52 AM
  • 22 1352_22 1389 _08192019_030841.mp4

Date
08/19/2019
W/O
782128
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00795
PipeID
P16633
Time
2:52 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6807
Sewer Name
22 CAMERON RELIEF TRUNK
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_782128_TV22121_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
22 1352
Downstream MH
22 1389
Dir. of Survey
Downstream
Length Surveyed
282.6 ft.
Total Length
282.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 1352 to 22 1389
MH: 22 1352MH: 22 1389downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 13522.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAG COAT THROUGHOUT2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start280.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish282.6 ft. AMH - Downstream Manhole, Survey Ends - 22 1389282.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT

    2.2 ft. - General Observation - MAG COAT THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2.2SSS
2.2MGOMAG COAT THROUGHOUT
0MGOCONNECTION AT MH 9 O'CLOCK
2.2SAP
0MWL
0MWM
282.6AMH22 1389
280.3SSS
282.6SAP
0AMH22 1352

Properties (6)

custom_field_two
3
customer
LACSD
datetime
2019-08-19T02:52:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30685