Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 21, 2019, 09:21 AM
  • 22 0324_22 0323 _08212019_022327.mp4

Date
08/21/2019
W/O
782128
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00795
PipeID
P16611
Time
2:21 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6808
Sewer Name
22 CAMERON RELIEF TRUNK
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_782128_TV22121_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
22 0324
Downstream MH
22 0323
Dir. of Survey
Downstream
Length Surveyed
403.8 ft.
Total Length
403.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0324 to 22 0323
MH: 22 0324MH: 22 0323downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 03240 ft. MWM - Water Mark, 30 %of cross sectional area3.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15 ft. MGO - General Observation - MAG COAT THROUGHOUT15 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start64.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 8"162 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 8"401.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish401.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish403.8 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK403.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0323

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT

    15 ft. - General Observation - MAG COAT THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    15 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MWL
0MGOCONNECTION AT MH 3 O'CLOCK
3.8SAP
403.8MGOCONNECTION AT MH 3 O'CLOCK
403.8AMH22 0323
0AMH22 0324
0MWM
401.3SAP
64.6TB
401.3SSS
15MGOMAG COAT THROUGHOUT
15SSS
162TB

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-21T02:21:54-07:00
documentation
PRO PIPE
is_lateral_inspection
false