Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 22, 2019, 04:54 AM
  • 22 0322_22 0321 _08212019_224149.mp4

Date
08/21/2019
W/O
782128
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00795
PipeID
P16609
Time
9:54 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6809
Sewer Name
22 CAMERON RELIEF TRUNK
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_782128_TV22121_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
22 0322
Downstream MH
22 0321
Dir. of Survey
Downstream
Length Surveyed
578.6 ft.
Total Length
578.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0322 to 22 0321
MH: 22 0322MH: 22 0321downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 03222 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT THROUGHOUT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start515.8 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 8"575.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish575.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish578.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0321

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT

    2 ft. - General Observation - MAG COAT THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2SAP
575.9SAP
0MWL
0MWM
575.9SSS
578.6AMH22 0321
0AMH22 0322
515.8TB
2MGOMAG COAT THROUGHOUT
2SSS

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-08-21T21:54:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false