Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 23, 2019, 09:20 AM
  • 03 0316_03 0315_10232019_022341.mp4

Date
10/23/2019
W/O
0792616
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00359
PipeID
P04890
Time
2:20 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1283
Sewer Name
03 ANAHEIM STREET TRUNK
City
ANAHEIM
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Routine Assessment
Project
20191017MDM_ANAHEIM_STREET_TRUNK
Material
NRCP
Shape
Circular
Height
30 in.
Upstream MH
03 0316
Downstream MH
03 0315
Dir. of Survey
Downstream
Length Surveyed
328.8 ft.
Total Length
328.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 03 0316 to 03 0315
MH: 03 0316MH: 03 0315downstream0 ft. MGO - General Observation - MH CONN 3:00 OPEN0 ft. AMH - Upstream Manhole, Survey Begins - 2:20AM0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - WHITE BUILD UP ON LINER2 ft. MGO - General Observation - 30" NRCP-CIPP13.9 ft. LFZ - Lining Failure Other, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - POSSIBLE SURFACE CORROSION UNDER WHITE BUILD UP69.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open82.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open178.9 ft. MGO - General Observation - 30" NRCP-CIPP328.2 ft. MGO - General Observation - MH CONN 4:00 OPEN328.2 ft. MGO - General Observation - MH CONN 9:00 ACTIVE328.2 ft. MGO - General Observation - MH CONN 3:00 OPEN328.2 ft. LFZ - Lining Failure Other, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish - POSSIBLE OUTER SURFACE CORROSIONUNDER WHITE BULD UP328.2 ft. MGO - General Observation - MH CONN 2:00 OPEN328.2 ft. MGO - General Observation - MH CONN 10:00 OPEN328.8 ft. AMH - Downstream Manhole, Survey Ends - 2:45AM

Observation photos (4)

  • General Observation - WHITE BUILD UP ON LINER

    2 ft. - General Observation - WHITE BUILD UP ON LINER

  • General Observation - 30" NRCP-CIPP

    2 ft. - General Observation - 30" NRCP-CIPP

  • Lining Failure Other, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - POSSIBLE SURFACE CORROSION UNDER WHITE BUILD UP

    13.9 ft. - Lining Failure Other, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - POSSIBLE SURFACE CORROSION UNDER WHITE BUILD UP

  • General Observation - 30" NRCP-CIPP

    178.9 ft. - General Observation - 30" NRCP-CIPP

Observations (17)

DistanceCodeObservation
328.8AMH2:45AM
328.2MGOMH CONN 4:00 OPEN
2MGOWHITE BUILD UP ON LINER
0MGOMH CONN 3:00 OPEN
328.2MGOMH CONN 9:00 ACTIVE
0AMH2:20AM
0MWM
328.2MGOMH CONN 3:00 OPEN
178.9MGO30" NRCP-CIPP
13.9LFZPOSSIBLE SURFACE CORROSION UNDER WHITE BUILD UP
2MGO30" NRCP-CIPP
328.2LFZPOSSIBLE OUTER SURFACE CORROSIONUNDER WHITE BULD UP
82.3TBOpen
328.2MGOMH CONN 2:00 OPEN
69.5TBOpen
328.2MGOMH CONN 10:00 OPEN
0MWL

Properties (7)

custom_field_three
POSSIBLE OUTER SURFACE CORROSION
custom_field_two
4
customer
LACSD
datetime
2019-10-23T02:20:15-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
lining
CIPP