Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 24, 2019, 07:53 AM
  • 03 0303A_03 0303_10242019_012825.mp4

Date
10/24/2019
W/O
0792616
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00359
PipeID
P05156
Time
12:53 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1284
Sewer Name
03 ANAHEIM STREET TRUNK
City
ANAHEIM
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Routine Assessment
Project
20191017MDM_ANAHEIM_STREET_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
39 in.
Upstream MH
03 0303A
Downstream MH
03 0303
Dir. of Survey
Downstream
Length Surveyed
601.7 ft.
Total Length
601.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3222
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 03 0303A to 03 0303
MH: 03 0303AMH: 03 0303downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:25AM0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area2 ft. MGO - General Observation - 39" VCP-CIPP2 ft. MGO - General Observation - BUILD BUILD UP ON LINER26.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: NO, Start - BUILD UP ON LINER54.9 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: NO - BUILD UP COVERING COMPLETE LINER195.6 ft. MGO - General Observation - CIPP LINER227.2 ft. RML - Roots Medium Lateral, from 12 to 05 o'clock, 20 %, within 8 inches of joint: NO227.2 ft. TBD - Tap Break-In Defective, at 12 o'clock, -, , within 8 inches of joint: NO, 6" - Active-95% ROOTS245.4 ft. MGO - General Observation - 39" VCP-CIPP359.3 ft. MWM - Water Mark, 20 %of cross sectional area601.3 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: NO, Finish - BUILD UP ON LINER601.3 ft. MGO - General Observation - MH CONN 3:00 ACTIVE601.7 ft. AMH - Downstream Manhole, Survey Ends - 2:10AM

Observation photos (8)

  • General Observation - 39" VCP-CIPP

    2 ft. - General Observation - 39" VCP-CIPP

  • General Observation - BUILD BUILD UP ON LINER

    2 ft. - General Observation - BUILD BUILD UP ON LINER

  • Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: NO, Start - BUILD UP ON LINER

    26.1 ft. - Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: NO, Start - BUILD UP ON LINER

  • Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: NO - BUILD UP COVERING COMPLETE LINER

    54.9 ft. - Deposits Attached Other, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: NO - BUILD UP COVERING COMPLETE LINER

  • General Observation - CIPP LINER

    195.6 ft. - General Observation - CIPP LINER

  • Roots Medium Lateral, from 12 to 05 o'clock, 20 %, within 8 inches of joint: NO

    227.2 ft. - Roots Medium Lateral, from 12 to 05 o'clock, 20 %, within 8 inches of joint: NO

  • Tap Break-In Defective, at 12 o'clock, -,  , within 8 inches of joint: NO, 6" - Active-95% ROOTS

    227.2 ft. - Tap Break-In Defective, at 12 o'clock, -, , within 8 inches of joint: NO, 6" - Active-95% ROOTS

  • General Observation - 39" VCP-CIPP

    245.4 ft. - General Observation - 39" VCP-CIPP

Observations (16)

DistanceCodeObservation
601.3DAZBUILD UP ON LINER
359.3MWM
54.9DAZBUILD UP COVERING COMPLETE LINER
227.2RML
2MGO39" VCP-CIPP
26.1DAZBUILD UP ON LINER
601.7AMH2:10AM
195.6MGOCIPP LINER
227.2TBDActive-95% ROOTS
0AMH1:25AM
601.3MGOMH CONN 3:00 ACTIVE
0MGOMH CONN 9:00 ACTIVE
0MWL
2MGOBUILD BUILD UP ON LINER
0MWM
245.4MGO39" VCP-CIPP

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2019-10-24T00:53:59-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
lining
CIPP