Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 23, 2019, 12:13 PM
  • 03 0313_03 0312_10232019_051619.mp4

Date
10/23/2019
W/O
0792616
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00359
PipeID
P04887
Time
5:13 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1284
Sewer Name
03 ANAHEIM STREET TRUNK
City
ANAHEIM
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Routine Assessment
Project
20191017MDM_ANAHEIM_STREET_TRUNK
Material
NRCP
Shape
Circular
Height
30 in.
Upstream MH
03 0313
Downstream MH
03 0312
Dir. of Survey
Downstream
Length Surveyed
321.8 ft.
Total Length
321.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 03 0313 to 03 0312
MH: 03 0313MH: 03 0312downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:15AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - WHITE BUILD UP ON LINER2 ft. MGO - General Observation - 30" NRCP-CIPP268 ft. MGO - General Observation - 30" NRCP-CIPP321.1 ft. MGO - General Observation - MH CONN 10:00 ACTIVE321.1 ft. MGO - General Observation - MH CONN 9:00 ACTIVE321.1 ft. MGO - General Observation - MH CONN 3:00 OPEN321.8 ft. AMH - Downstream Manhole, Survey Ends - 5:30AM

Observation photos (3)

  • General Observation - WHITE BUILD UP ON LINER

    2 ft. - General Observation - WHITE BUILD UP ON LINER

  • General Observation - 30" NRCP-CIPP

    2 ft. - General Observation - 30" NRCP-CIPP

  • General Observation - 30" NRCP-CIPP

    268 ft. - General Observation - 30" NRCP-CIPP

Observations (10)

DistanceCodeObservation
321.1MGOMH CONN 10:00 ACTIVE
2MGOWHITE BUILD UP ON LINER
0MWL
2MGO30" NRCP-CIPP
0AMH5:15AM
0MWM
321.1MGOMH CONN 9:00 ACTIVE
321.1MGOMH CONN 3:00 OPEN
321.8AMH5:30AM
268MGO30" NRCP-CIPP

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2019-10-23T05:13:37-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
lining
CIPP