Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 18, 2019, 08:22 AM
  • 03 0331_03 0330_10182019_022204.mp4

Date
10/18/2019
W/O
0792616
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00359
PipeID
P04905
Time
1:22 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1279
Sewer Name
03 ANAHEIM STREET TRUNK
City
ANAHEIM
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Routine Assessment
Project
20191017MDM_ANAHEIM_STREET_TRUNK
Material
NRCP
Shape
Circular
Height
30 in.
Upstream MH
03 0331
Downstream MH
03 0330
Dir. of Survey
Downstream
Length Surveyed
329.8 ft.
Total Length
329.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 03 0331 to 03 0330
MH: 03 0331MH: 03 0330downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - MH CONN 3:00 OPEN0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:45AM2 ft. MGO - General Observation - 30" NRCP-CIPP2 ft. MGO - General Observation - WHITE BUILDUP ON PIPE103.8 ft. MGO - General Observation - REPAIRED OR PATCHED AREAS 10:00 START123.7 ft. MGO - General Observation - REPAIRED OR PATCHED AREAS FINISH218.5 ft. MGO - General Observation - 30" NRCP-CIPP329.4 ft. MGO - General Observation - MH CONN 9:00 ACTIVE329.8 ft. AMH - Downstream Manhole, Survey Ends - 2:05AM

Observation photos (4)

  • General Observation - 30" NRCP-CIPP

    2 ft. - General Observation - 30" NRCP-CIPP

  • General Observation - WHITE BUILDUP ON PIPE

    2 ft. - General Observation - WHITE BUILDUP ON PIPE

  • General Observation - REPAIRED OR PATCHED AREAS 10:00 START

    103.8 ft. - General Observation - REPAIRED OR PATCHED AREAS 10:00 START

  • General Observation - 30" NRCP-CIPP

    218.5 ft. - General Observation - 30" NRCP-CIPP

Observations (11)

DistanceCodeObservation
218.5MGO30" NRCP-CIPP
0MWL
0MGOMH CONN 3:00 OPEN
329.8AMH2:05AM
0MWM
329.4MGOMH CONN 9:00 ACTIVE
2MGO30" NRCP-CIPP
0AMH1:45AM
2MGOWHITE BUILDUP ON PIPE
123.7MGOREPAIRED OR PATCHED AREAS FINISH
103.8MGOREPAIRED OR PATCHED AREAS 10:00 START

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2019-10-18T01:22:54-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
lining
CIPP