Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 17, 2019, 08:37 AM
  • 03 0338_03 0337_10172019_021936.mp4

Date
10/17/2019
W/O
0792616
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00359
PipeID
P04912
Time
1:37 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1278
Sewer Name
03 ANAHEIM STREET TRUNK
City
ANAHEIM
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Routine Assessment
Project
20191017MDM_ANAHEIM_STREET_TRUNK
Material
NRCP
Shape
Circular
Height
30 in.
Upstream MH
03 0337
Downstream MH
03 0338
Dir. of Survey
Upstream
Length Surveyed
19.8 ft.
Total Length
19.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4131
O&M Rating
7
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole 03 0337 to 03 0338
MH: 03 0337MH: 03 0338upstream0 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM0.6 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish - SLUDGE0.6 ft. DSZ - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO - SLUDGE IN SIDE MH0.6 ft. MGO - General Observation - MH CONN 12:00 OPEM0.8 ft. MGO - General Observation - ZOOM 19'15.8 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start - SLUDGE19.8 ft. MGO - General Observation - MH CONN 3:00 ACTIVE19.8 ft. MWM - Water Mark, 20 %of cross sectional area - NO FLOW19.8 ft. AMH - Downstream Manhole, Survey Begins - 2:05AM19.8 ft. MWL - Water Level, 20 %of cross sectional area - NO FLOW

Observation photos (3)

  • Deposits Settled Other,  20 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO, Start - SLUDGE

    4 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start - SLUDGE

  • General Observation - ZOOM 19'

    19 ft. - General Observation - ZOOM 19'

  • Deposits Settled Other,  30 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO - SLUDGE IN SIDE MH

    19.2 ft. - Deposits Settled Other, 30 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO - SLUDGE IN SIDE MH

Observations (10)

DistanceCodeObservation
19MGOZOOM 19'
19.2DSZSLUDGE
4DSZSLUDGE
19.8AMH2:15AM
19.2DSZSLUDGE IN SIDE MH
19.2MGOMH CONN 12:00 OPEM
0MGOMH CONN 3:00 ACTIVE
0MWMNO FLOW
0AMH2:05AM
0MWLNO FLOW

Properties (6)

custom_field_two
4
customer
LACSD
datetime
2019-10-17T01:37:30-07:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
lining
CIPP