Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 23, 2019, 03:53 PM
  • G 0314_G 0313_10232019_103642.mp4

  • G 0314_G 0313_10232019_104723.mp4

  • G 0314_G 0313_10232019_104826.mp4

Date
10/23/2019
W/O
0792773
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00228
PipeID
P01750
Time
8:53 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8109
Sewer Name
01 WRIGHT ROAD TRUNK
City
SOUTH GATE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
11
Purpose
Capital Improvement Program Assesment
Project
20191018DF_JOINT_OUTFALL_G_UNIT_9_TRUNK
Material
RCP-CTL
Shape
Circular
Height
33 in.
Upstream MH
G 0314
Downstream MH
G 0313
Dir. of Survey
Downstream
Length Surveyed
297.5 ft.
Total Length
297.5 ft.
Structural Index
3
Structural Quick
5132
Structural Rating
13
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole G 0314 to G 0313
MH: G 0314MH: G 0313downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:30 AM0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - MH2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.7 ft. MGP - General Photograph54.1 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES130.5 ft. MGP - General Photograph249.8 ft. MGP - General Photograph293 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish293 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish293 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish293 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG293.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish296.5 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)297 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach297.5 ft. AMH - Downstream Manhole, Survey Ends - 10:56 AM

Observation photos (8)

  • Upstream Manhole, Survey Begins - 10:30 AM

    0 ft. - Upstream Manhole, Survey Begins - 10:30 AM

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    21.7 ft. - General Photograph

  • Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    54.1 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Photograph

    130.5 ft. - General Photograph

  • General Photograph

    249.8 ft. - General Photograph

Observations (21)

DistanceCodeObservation
2CM
293SRC
0AMH10:30 AM
293CM
54.1DAR
249.8MGP
2SZ65% MAG
0MWM
293SAP
2SSS
0MWL
2SRC
297.5AMH10:56 AM
130.5MGP
297MGOPeeling & Flaking Throughout The Reach
293.1SSS
293SZ65% MAG
296.5MGOGREASE THROUGHOUT THE REACH (5%)
2VCMH
2SAP
21.7MGP

Properties (6)

custom_field_three
MISSING TILES/AGGREGATE PROJECTING
custom_field_two
2
customer
LACSD
datetime
2019-10-23T08:53:10-07:00
documentation
FRANKLIN, RUVALCABA, IGNACIO, BRAR
is_lateral_inspection
false