G 0315_G 0314_10232019_100955.mp4
0 ft. - Upstream Manhole, Survey Begins - 8:56 AM
2 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
28.9 ft. - General Photograph
111.2 ft. - General Photograph
189.6 ft. - General Photograph
230 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
273.1 ft. - General Photograph
304.2 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 309.6 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 2 | DAR | — |
| 304.2 | MGP | — |
| 0 | AMH | 8:56 AM |
| 309.6 | VC | @ MH |
| 307.3 | SZ | 65% MAG |
| 307.3 | SRC | — |
| 2 | SRC | — |
| 2 | SZ | 65% MAG |
| 189.6 | MGP | — |
| 28.9 | MGP | — |
| 2 | SAP | — |
| 307.3 | DAR | — |
| 307.3 | CM | — |
| 309.6 | MGO | Peeling & Flaking Throughout The Reach |
| 307.3 | SSS | — |
| 2 | SSS | — |
| 111.2 | MGP | — |
| 307.3 | SAP | — |
| 2 | CM | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 230 | SRV | — |
| 309.6 | AMH | 10:35 AM |
| 307.3 | SRV | — |
| 273.1 | MGP | — |