G 0316_G 0315_10222019_120230.mp4
0 ft. - Upstream Manhole, Survey Begins - 12:00 PM
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
26.7 ft. - General Photograph
29.1 ft. - General Photograph
89.3 ft. - General Photograph
99.8 ft. - General Photograph
125.1 ft. - General Photograph
125.1 ft. - General Photograph
145.5 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 2 | SZ | 65% MAG |
| 194.2 | SAP | — |
| 99.8 | MGP | — |
| 26.7 | MGP | — |
| 193.7 | MGO | Grease Throughout The Reach (5%) |
| 0 | MWM | — |
| 193.2 | SZ | 65% MAG |
| 125.1 | MGP | — |
| 2 | SAP | — |
| 2 | SRC | — |
| 125.1 | MGP | — |
| 2 | SSS | — |
| 194.4 | CM | — |
| 2 | VC | @ MH |
| 192.6 | VC | @ MH |
| 29.1 | MGP | — |
| 0 | AMH | 12:00 PM |
| 2 | CM | — |
| 194.3 | MGO | Peeling & Flaking Throughout The Reach |
| 193.8 | SRC | — |
| 195 | AMH | 12:23 PM |
| 0 | MWL | — |
| 194.7 | SSS | — |
| 89.3 | MGP | — |
| 145.5 | MGP | — |