G 0319_G 0318_10222019_104822.mp4
0 ft. - Upstream Manhole, Survey Begins - 10:12 AM
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
22.8 ft. - General Photograph
35.3 ft. - General Photograph
48.1 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
76.5 ft. - General Photograph
142.9 ft. - General Photograph
300.1 ft. - General Photograph
344.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 458.9 | SSS | — |
| 2 | CM | — |
| 458.9 | SRC | — |
| 142.9 | MGP | — |
| 344.5 | SRV | — |
| 458.9 | CM | — |
| 0 | MWL | — |
| 48.1 | SRC | — |
| 458.9 | SAP | — |
| 462.3 | MGO | Conn. @ Mh, 5 O' Clock. Active |
| 458.9 | SRV | — |
| 76.5 | MGP | — |
| 2 | SZ | 60% MAG |
| 22.8 | MGP | — |
| 35.3 | MGP | — |
| 458.9 | SZ | 65% MAG |
| 2 | SAP | — |
| 462.3 | MGO | Peeling & Flaking Throughout The Reach |
| 462.3 | AMH | 11:23 AM |
| 0 | AMH | 10:12 AM |
| 300.1 | MGP | — |
| 462.3 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 2 | SSS | — |
| 462.3 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 0 | MWM | — |