G 0320_G 0319_10212019_113159.mp4
0 ft. - Upstream Manhole, Survey Begins - 11:29 AM
2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 60% MAG
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
26 ft. - General Photograph
48.2 ft. - General Photograph
67.2 ft. - General Photograph
135.1 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 2 | CM | — |
| 2 | SSS | — |
| 2 | MGO | Conn. @ Mh, 3 O' Clock. Active/DROP CONN |
| 26 | MGP | — |
| 48.2 | MGP | — |
| 167.9 | SSS | — |
| 2 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 168 | AMH | 11:46 AM |
| 2 | SZ | 60% MAG |
| 135.1 | MGP | — |
| 167.5 | SAP | — |
| 2 | SAP | — |
| 67.2 | MGP | — |
| 168 | CM | — |
| 0 | MWM | — |
| 166.4 | SZ | 60% MAG |
| 2 | SRV | — |
| 165.5 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 0 | MWL | — |
| 167.2 | SRV | — |
| 0 | AMH | 11:29 AM |
| 2 | VC | @ MH |
| 165.7 | MGO | Peeling & Flaking Throughout The Reach |