G 0322_G 0321_10212019_103527.mp4
0 ft. - Upstream Manhole, Survey Begins - 9:29 AM
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG
15.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
32.6 ft. - General Photograph
77.7 ft. - General Photograph
188.1 ft. - General Photograph
306.8 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 77.7 | MGP | — |
| 0 | MWM | — |
| 32.6 | MGP | — |
| 343.2 | AMH | 11:06 AM |
| 2 | SAP | — |
| 343 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 188.1 | MGP | — |
| 0 | MWL | — |
| 343.2 | VC | @ MH |
| 2 | CM | — |
| 343.2 | MGO | Peeling & Flaking Throughout The Reach |
| 340.3 | SRV | — |
| 343.2 | MGO | Grease Throughout The Reach (5%) |
| 340.3 | CM | — |
| 340.3 | SZ | 65% MAG |
| 340.3 | SSS | — |
| 2 | SSS | — |
| 2 | SZ | 65% MAG |
| 306.8 | MGP | — |
| 0 | AMH | 9:29 AM |
| 340.3 | SAP | — |
| 15.5 | SRV | — |