Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 16, 2017, 05:39 PM
  • 19 0012_19 0011_10162017_104518.mp4

Date
10/16/2017
W/O
0651278
Weather
Dry
Operator/Surveyor
SANTIAGO OBREGON
Sewer ID
Z00727
PipeID
P15042
Time
10:39 AM
Certificate
U-1014-06022541
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Jetting
Media Label
G7539
Sewer Name
19 PALO VERDE TRUNK
City
LONG BEACH
Loc. details
Woods
Location Code
E
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
11
Purpose
Routine Assessment
Project
20171016SHO_PALO_VERDE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
19 0011
Downstream MH
19 0012
Dir. of Survey
Upstream
Length Surveyed
384.8 ft.
Total Length
384.8 ft.
Structural Index
2
Structural Quick
2111
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 19 0011 to 19 0012
MH: 19 0011MH: 19 0012upstream0 ft. AMH - Upstream Manhole, Survey Ends - 11052.7 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)58 ft. CC - Crack Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES106.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN380.8 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES384.8 ft. MWL - Water Level, 45 %of cross sectional area384.8 ft. MWM - Water Mark, 55 %of cross sectional area384.8 ft. AMH - Downstream Manhole, Survey Begins - 1045

Observations (8)

DistanceCodeObservation
384.8AMH1105
326.8CC
382.1MGOGREASE THROUGHOUT THE REACH (5%)
278.5TFOPEN
0MWL
0MWM
0AMH1045
4CL

Properties (6)

custom_field_three
NO MAJOR DEFECTS
custom_field_two
4
customer
LACSD
datetime
2017-10-16T10:39:19-07:00
documentation
OBREGON, IGNACIO, FRANKLIN, BRAR
is_lateral_inspection
false