Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 30, 2019, 05:09 AM
  • 19 0275_19 0274 _08292019_224037.mp4

Date
08/29/2019
W/O
782288
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00732
PipeID
P15245
Time
10:09 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6917
Sewer Name
19 209TH STREET TRUNK
City
LAKEWOOD
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_782288_TV19069_AUG2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
19 0275
Downstream MH
19 0274
Dir. of Survey
Downstream
Length Surveyed
411.2 ft.
Total Length
411.2 ft.
Structural Index
4
Structural Quick
4O27
Structural Rating
342
O&M Index
2
O&M Quick
312R
O&M Rating
195
Overall Index
3
Overall Quick
Overall Rating
537
Pipe schematic from manhole 19 0275 to 19 0274
MH: 19 0275MH: 19 0274downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 19 02750 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area6.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES9.1 ft. FM - Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES10 ft. MGO - General Observation - SLIME COAT THROUGHOUT18 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start18 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start18 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27.1 ft. MWL - Water Level, 45 %of cross sectional area37.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"46.7 ft. RMC - Roots Medium Connection, from 01 to 04 o'clock, 10 %, within 8 inches of joint: NO46.7 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 4" - 100% BLOCKAGE51.5 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish65 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"86.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"89.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"127.1 ft. FM - Fracture Multiple, from 02 to 05 o'clock, within 8 inches of joint: YES138 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"186.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"189.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"241.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"243.1 ft. FM - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES287 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"290.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"338.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"342 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"362.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start364.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start387.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"390.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"409.5 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish409.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish409.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish411 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish411.2 ft. AMH - Downstream Manhole, Survey Ends - 19 0274

Observation photos (13)

  • Upstream Manhole, Survey Begins - 19 0275

    0 ft. - Upstream Manhole, Survey Begins - 19 0275

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    6.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES

    9.1 ft. - Fracture Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES

  • General Observation - SLIME COAT THROUGHOUT

    10 ft. - General Observation - SLIME COAT THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    18 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 10 %of cross sectional area, Start

    18 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    18 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Level, 45 %of cross sectional area

    27.1 ft. - Water Level, 45 %of cross sectional area

  • Roots Medium Connection, from 01 to 04 o'clock, 10 %, within 8 inches of joint: NO

    46.7 ft. - Roots Medium Connection, from 01 to 04 o'clock, 10 %, within 8 inches of joint: NO

  • Fracture Multiple, from 02 to 05 o'clock, within 8 inches of joint: YES

    127.1 ft. - Fracture Multiple, from 02 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

    243.1 ft. - Fracture Multiple, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    362.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    364.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

Observations (39)

DistanceCodeObservation
338.9TFC
387.8TF
411DAE
140.8TFC
290.3TF
0MGOCONNECTION AT MH 3 O'CLOCK
411.2AMH19 0274
51.5MWLS
138TFA
241.5TFC
0AMH19 0275
364.1DAE
409.5FM
409.5DAE
18DAGS
287TFC
409.5DAGS
189.8TFA
18MWLS
9.1FM
37.4TFC
65TF
46.7RMC
86.3TFC
18FM
243.1FM
0MWM
10MGOSLIME COAT THROUGHOUT
6.1FM
27.1MWL
186.7TFC
342TFA
0MWL
238.6TFC
127.1FM
89.3TFC
390.9TFC
362.4DAE
46.7TB100% BLOCKAGE

Properties (6)

additional_info
SC378514
custom_field_two
2
customer
LACSD
datetime
2019-08-29T22:09:16-07:00
documentation
PROPIPE
is_lateral_inspection
false