29 0400_29 0399A_08282019_010207.mp4

0 ft. - Upstream Manhole, Survey Begins - 29 0400

2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
2.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: NO - AT MOUTH OF PIPE
2.5 ft. - Joint Offset Medium
2.7 ft. - Broken, from 08 to 11 o'clock, within 8 inches of joint: YES
2.7 ft. - Roots Medium Joint, from 07 to 09 o'clock, 10 %, within 8 inches of joint: YESR

4.4 ft. - Material Change, Vitrified clay pipe - END OF LINER
6.9 ft. - Crack Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 13 | DAGS | — |
| 6.9 | CS | — |
| 0 | AMH | 29 0400 |
| 13.1 | AMH | 29 0399A |
| 2.5 | JOM | — |
| 0 | MWM | — |
| 2.7 | B | — |
| 4.4 | MMC | END OF LINER |
| 2.1 | DAGS | — |
| 0 | MWL | — |
| 13.1 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 5.7 | RPL | CIPP |
| 2.7 | RMJ | — |
| 2.1 | CM | AT MOUTH OF PIPE |