Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 28, 2019, 08:36 AM
  • 29 0501_29 0745 _08282019_020430.mp4

Date
08/28/2019
W/O
782451
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z01090
PipeID
P24550
Time
1:36 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6914
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_782451_TV29066_AUG2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0501
Downstream MH
29 0745
Dir. of Survey
Downstream
Length Surveyed
458.5 ft.
Total Length
458.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2Q00
O&M Rating
180
Overall Index
2
Overall Quick
Overall Rating
180
Pipe schematic from manhole 29 0501 to 29 0745
MH: 29 0501MH: 29 0745downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 05010 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area4.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start19.5 ft. TFB - Tap Factory Made Abandoned, at 09 o'clock, -, within 8 inches of joint: NO, 6"37.1 ft. MGO - General Observation - SLIME COAT THROUGHOUT72.5 ft. TFB - Tap Factory Made Abandoned, at 03 o'clock, -, within 8 inches of joint: NO, 6"116.8 ft. TFB - Tap Factory Made Abandoned, at 10 o'clock, -, within 8 inches of joint: NO, 6"132.1 ft. TFB - Tap Factory Made Abandoned, at 02 o'clock, -, within 8 inches of joint: NO, 6"170.3 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6"191.1 ft. TFB - Tap Factory Made Abandoned, at 03 o'clock, -, within 8 inches of joint: NO, 6"219.2 ft. TFB - Tap Factory Made Abandoned, at 09 o'clock, -, within 8 inches of joint: NO, 6"248.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"252.8 ft. TFB - Tap Factory Made Abandoned, at 03 o'clock, -, within 8 inches of joint: NO, 6"309.1 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"314.6 ft. TFB - Tap Factory Made Abandoned, at 03 o'clock, -, within 8 inches of joint: NO, 6"315.7 ft. TFB - Tap Factory Made Abandoned, at 09 o'clock, -, within 8 inches of joint: NO, 6"319.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"376.1 ft. TFB - Tap Factory Made Abandoned, at 03 o'clock, -, within 8 inches of joint: NO, 6"419.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6"423.1 ft. TFB - Tap Factory Made Abandoned, at 09 o'clock, -, within 8 inches of joint: NO, 6"424.8 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"456.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish458.5 ft. AMH - Downstream Manhole, Survey Ends - 29 0501458.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (3)

  • Upstream Manhole, Survey Begins - 29 0501

    0 ft. - Upstream Manhole, Survey Begins - 29 0501

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - SLIME COAT THROUGHOUT

    37.1 ft. - General Observation - SLIME COAT THROUGHOUT

Observations (25)

DistanceCodeObservation
116.8TFB
315.7TFB
458.5AMH29 0501
4.5DAGS
309.1TB
423.1TFB
248.2TF
19.5TFB
424.8TF
0AMH29 0501
170.3TB
419.9TFC
37.1MGOSLIME COAT THROUGHOUT
458.5MGOCONNECTION AT MH 3 O'CLOCK
132.1TFB
0MWM
376.1TFB
319.7TFC
219.2TFB
252.8TFB
456.3DAGS
72.5TFB
191.1TFB
0MWL
314.6TFB

Properties (7)

additional_info
SC378511
custom_field_two
4
customer
LACSD
datetime
2019-08-28T01:36:04-07:00
documentation
PROPIPE
is_lateral_inspection
false
lining
CIPP