29 0447_29 0446 _08272019_234459.mp4

0 ft. - Upstream Manhole, Survey Begins - 29 0447
4.5 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERALS
9.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

11 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

25 ft. - Vermin Cockroach, within 8 inches of joint: YES - COCKROACHES IN LINE

96 ft. - Surface Roughness Increased, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
96.1 ft. - Water Level, Sag in pipe, 20 %of cross sectional area, Start
101.7 ft. - Deposits Settled Compacted, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 6.4 | TFB | — |
| 0 | MWL | — |
| 0 | AMH | 29 0447 |
| 105.8 | MSA | DEBRIS |
| 105.8 | DAZ | — |
| 105.8 | MWLS | — |
| 9.4 | DAGS | — |
| 41.2 | TFA | — |
| 105.8 | DAGS | — |
| 96 | SRI | — |
| 96.1 | MWLS | — |
| 101.7 | DSC | — |
| 25 | VC | COCKROACHES IN LINE |
| 105 | DAE | — |
| 105 | SRI | — |
| 0 | MWM | — |
| 4.5 | DAZ | MINERALS |
| 53.1 | TFB | — |
| 105.8 | DSC | — |
| 11 | DAE | — |