Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2015, 04:26 PM
  • 02 1887_02 1886_12282015_090202.mp4

Date
12/28/2015
W/O
0541754
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z01172
PipeID
P04251
Time
8:26 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7025
Sewer Name
02 DOUGLAS AVENUE RELOCATION TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Capital Improvement Program Assesment
Project
20151228AM_DOUGLAS_AVENUE_RELOCATION_TRUNK
Material
NRCP
Shape
Circular
Height
8 in.
Upstream MH
02 1886
Downstream MH
02 1887
Dir. of Survey
Upstream
Length Surveyed
294.3 ft.
Total Length
294.3 ft.
Structural Index
3
Structural Quick
5146
Structural Rating
47
O&M Index
2
O&M Quick
2500
O&M Rating
10
Overall Index
3
Overall Quick
Overall Rating
57
Pipe schematic from manhole 02 1886 to 02 1887
MH: 02 1886MH: 02 1887upstream0 ft. AMH - Upstream Manhole, Survey Ends - 9:54 AM2.1 ft. MGO - General Observation - OPEN CONN. INSIDE THE MH. @ 01 O'CLOCK2.1 ft. MGO - General Observation - ROACHES INSIDE THE MH.2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish2.1 ft. MGO - General Observation - 80% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH13.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"28.6 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED66.3 ft. MGO - General Observation - 80% MAG COAT FROM 08 TO 04 O'CLOCK, START68 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, 10% BLOCKED83.1 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, 20% BLOCKED90.8 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES96.9 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES116 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 6" - OPEN120.8 ft. FM - Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES127 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES142 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES151 ft. B - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES158.3 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN161.5 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, 10% BLOCKED173.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"175.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES206.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN223.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES224.4 ft. MGP - General Photograph - FRACTURE225.1 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES250.8 ft. FM - Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES251.5 ft. FC - Fracture Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES251.7 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES290.4 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 4" - OPEN292.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start292.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start294.3 ft. AMH - Downstream Manhole, Survey Begins - 9:01 AM294.3 ft. MWM - Water Mark, 15 %of cross sectional area294.3 ft. MWL - Water Level, 5 %of cross sectional area294.3 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 09 O'CLOCK294.3 ft. MGO - General Observation - ROACHES INSIDE THE MH.

Observation photos (17)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    42.6 ft. - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Fracture Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES

    42.8 ft. - Fracture Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES

    43.5 ft. - Fracture Multiple, from 08 to 03 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    69.2 ft. - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • General Photograph - FRACTURE

    69.9 ft. - General Photograph - FRACTURE

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    70.6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    119.1 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, 10% BLOCKED

    132.8 ft. - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, 10% BLOCKED

  • Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN

    136 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN

  • Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

    143.3 ft. - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    152.3 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    197.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, 20% BLOCKED

    211.2 ft. - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, 20% BLOCKED

  • General Observation - 80% MAG COAT FROM 08 TO 04 O'CLOCK, START

    228 ft. - General Observation - 80% MAG COAT FROM 08 TO 04 O'CLOCK, START

  • Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED

    265.7 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED

  • General Observation - OPEN CONN. INSIDE THE MH. @ 01 O'CLOCK

    292.2 ft. - General Observation - OPEN CONN. INSIDE THE MH. @ 01 O'CLOCK

Observations (37)

DistanceCodeObservation
0AMH9:01 AM
2SSS
3.9TBOPEN
143.3B
292.2MGOOPEN CONN. INSIDE THE MH. @ 01 O'CLOCK
292.2MGOROACHES INSIDE THE MH.
167.3FM
173.5FM
69.2FL
152.3FL
2SAV
178.3TFOPEN
70.6FM
136TFDOPEN, BROKEN
280.6TFA
0MWM
43.5FM
292.2SSS
228MGO80% MAG COAT FROM 08 TO 04 O'CLOCK, START
119.1FM
69.9MGPFRACTURE
0MWL
87.9TFOPEN
226.3TFDACTIVE, 10% BLOCKED
292.2SAV
42.8FC
42.6FL
211.2TFDACTIVE, 20% BLOCKED
132.8TFDOPEN, 10% BLOCKED
197.4FM
0MGOACTIVE CONN. INSIDE THE MH. @ 09 O'CLOCK
292.2MGO80% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH
203.5CL
121.1TFA
265.7TFDOPEN, CRACKED
294.3AMH9:54 AM
0MGOROACHES INSIDE THE MH.

Properties (7)

additional_info
RFIR INSPECTION
custom_field_three
FRACTURES AND BROKEN PIPE
custom_field_two
1
customer
LACSD
datetime
2015-12-28T08:26:30-08:00
documentation
MIRANDA, MIRABAL, FRANKLIN
is_lateral_inspection
false