05 1545_05 1544A_12142015_040156.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLISTERING
8 ft. - General Photograph - 18" RCP
8 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
27.8 ft. - Surface Aggregate Visible, from 12 to 02 o'clock, within 8 inches of joint: NO
148.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING LAITANCE COAT
178.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELIG CONCRETE
255.2 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT
286.1 ft. - Surface Aggregate Visible, from 12 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC
318.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
353.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
355.2 ft. - Surface Aggregate Visible, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
396.4 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
408.6 ft. - Repair Patch, from 12 to 01 o'clock, within 8 inches of joint: NO - POSSIBLE 6" X3"
408.6 ft. - General Photograph - POSIBLE REPAIR
459.3 ft. - General Photograph
459.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 644.1 | MGO | MH CONN ACTIVE |
| 644.5 | AMH | 5:00AM |
| 1 | MWM | — |
| 0 | AMH | 3:55AM |
| 350.5 | TF | Active |
| 178.1 | SSS | PEELIG CONCRETE |
| 644.1 | DSZ | PEELING CONCRETE FROM PIPE |
| 396.4 | SAV | SEVERE AGG |
| 286.1 | SAV | SEVERE AGG SPORATIC |
| 408.6 | RPP | POSSIBLE 6" X3" |
| 408.6 | MGP | POSIBLE REPAIR |
| 8 | MGP | 18" RCP |
| 2 | DAGS | — |
| 148.5 | SSS | PEELING LAITANCE COAT |
| 355.2 | SAV | SEVERE AGG |
| 468.3 | SAP | — |
| 2 | SSS | LAITANCE COAT PEELING BLISTERING |
| 1 | MWL | — |
| 353.3 | SSS | PEELING CONCRETE |
| 27.8 | SAV | — |
| 459.3 | MGP | — |
| 255.2 | SSS | BLISTERING LAITANCE COAT |
| 644.1 | SSS | PEELING CONCRETE |
| 318.6 | SSS | — |
| 350.5 | DAGS | — |
| 644.1 | SAV | SEVERE AGG SPORATIC |
| 8 | SAV | SEVERE AGG SPORATIC |
| 459.3 | SAP | SEVERE AGG |
| 1 | MGO | MH CONN ACTIVE 9:00 |