Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2015, 04:43 PM
  • Section#8_02 0171_02 0170__SI_Date__SI_Preset.mp4

Date
12/02/2015
W/O
0536410
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00251
PipeID
P02475
Time
8:43 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7006
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
32
Purpose
Routine Assessment
Project
20151201AM_DOWNEY_BELLFLOWER_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
02 0171
Downstream MH
02 0170
Dir. of Survey
Downstream
Length Surveyed
344.3 ft.
Total Length
344.3 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 02 0171 to 02 0170
MH: 02 0171MH: 02 0170downstream0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CRACKED UP CHANNEL0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 8:44 AM2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start8 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES21.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"25 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4" - OPEN75.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"78.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"133.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"135.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"186.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"190 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"247.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"250.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"304.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"307.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"339.5 ft. CS - Crack Spiral, from 02 to 03 o'clock, within 8 inches of joint: YES342.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish344.3 ft. AMH - Downstream Manhole, Survey Ends - 9:07 AM

Observations (23)

DistanceCodeObservation
250.6TFC
78.8TFC
0MGOROACHES INSIDE THE MH.
0MWM
133.1TFC
0MGOCRACKED UP CHANNEL
135.8TFC
307.4TFC
2DAGS
0MWL
25TFOPEN
190TFC
8CL
186.9TFC
0MGOACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK
0AMH8:44 AM
339.5CS
247.5TFC
342.3DAGS
304.4TFC
75.7TFC
344.3AMH9:07 AM
21.7TFC

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2015-12-02T08:43:09-08:00
documentation
MIRANDA, FRANKLIN, SHADLER, MIRABAL
is_lateral_inspection
false