Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 15, 2019, 06:13 AM
  • 32 1174_32 1173 _08142019_233546.mp4

Date
08/14/2019
W/O
782269
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19628
Time
11:13 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6862
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782269_TV32021_AUG2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1173
Downstream MH
32 1174
Dir. of Survey
Upstream
Length Surveyed
597.4 ft.
Total Length
597.4 ft.
Structural Index
3
Structural Quick
3W2W
Structural Rating
595
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
595
Pipe schematic from manhole 32 1173 to 32 1174
MH: 32 1173MH: 32 1174upstream0 ft. AMH - Upstream Manhole, Survey Ends - 32 11741.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish35.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"56.9 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"156.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"165.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"275.3 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"391.4 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"504.7 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"595.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start595.4 ft. MGO - General Observation - MAG COATING THROUGHOUT 30%595.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start597.4 ft. MWM - Water Mark, 15 %of cross sectional area597.4 ft. MWL - Water Level, 10 %of cross sectional area597.4 ft. AMH - Downstream Manhole, Survey Begins - 32 1173

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT 30%

    2 ft. - General Observation - MAG COATING THROUGHOUT 30%

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
595.5SSS
440.6TF
0MWM
597.4AMH32 1174
206TBA
562.1TBA
540.5TBA
2SSS
92.7TBA
595.5SAP
322.1TBA
432.1TFC
0MWL
2MGOMAG COATING THROUGHOUT 30%
2SAP
428TFC
0AMH32 1173

Properties (6)

additional_info
SC378332
custom_field_two
2
customer
LACSD
datetime
2019-08-14T23:13:43-07:00
documentation
PRO PIPE
is_lateral_inspection
false