Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2019, 06:56 AM
  • 32 1171_32 1170_08162019_001042.mp4

Date
08/15/2019
W/O
782269
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19625
Time
11:56 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6864
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782269_TV32021_AUG2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1170
Downstream MH
32 1171
Dir. of Survey
Upstream
Length Surveyed
199.4 ft.
Total Length
199.4 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
195
O&M Index
2
O&M Quick
2G00
O&M Rating
78
Overall Index
2
Overall Quick
Overall Rating
273
Pipe schematic from manhole 32 1170 to 32 1171
MH: 32 1170MH: 32 1171upstream0 ft. AMH - Upstream Manhole, Survey Ends - 32 11711.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish33.3 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"90.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"197.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start197.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start197.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start199.4 ft. MWL - Water Level, 10 %of cross sectional area199.4 ft. AMH - Downstream Manhole, Survey Begins - 32 1170199.4 ft. MWM - Water Mark, 15 %of cross sectional area

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
197.9DAGS
2SAP
199.4AMH32 1171
197.9SAP
0MWL
0AMH32 1170
197.9SSS
2SSS
0MWM
2DAGS
109.1TFC
166.1TBA

Properties (6)

additional_info
SC378334
custom_field_two
2
customer
LACSD
datetime
2019-08-15T23:56:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false