Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2019, 07:34 AM
  • 32 1167_32 1166_08162019_004357.mp4

Date
08/16/2019
W/O
782269
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19621
Time
12:34 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6864
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782269_TV32021_AUG2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1167
Downstream MH
32 1166
Dir. of Survey
Downstream
Length Surveyed
116.4 ft.
Total Length
116.4 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
115
O&M Index
2
O&M Quick
2D00
O&M Rating
46
Overall Index
2
Overall Quick
Overall Rating
161
Pipe schematic from manhole 32 1167 to 32 1166
MH: 32 1167MH: 32 1166downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11672 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start114.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish114.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish114.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish116.4 ft. AMH - Downstream Manhole, Survey Ends - 32 1166

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
114.7SAP
2DAGS
0MWM
114.7DAGS
114.7SSS
0MWL
2SSS
0AMH32 1167
2SAP
116.4AMH32 1166

Properties (6)

additional_info
SC378334
custom_field_two
2
customer
LACSD
datetime
2019-08-16T00:34:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false