Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2019, 08:22 AM
  • 32 1166_32 1165_08162019_013323.mp4

Date
08/16/2019
W/O
782269
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19620
Time
1:22 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6864
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782269_TV32021_AUG2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1165
Downstream MH
32 1166
Dir. of Survey
Upstream
Length Surveyed
170.6 ft.
Total Length
170.6 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
65
O&M Index
2
O&M Quick
2F00
O&M Rating
66
Overall Index
2
Overall Quick
Overall Rating
131
Pipe schematic from manhole 32 1165 to 32 1166
MH: 32 1165MH: 32 1166upstream0 ft. AMH - Upstream Manhole, Survey Ends - 32 11662.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish101.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish101.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish101.4 ft. MMC - Material Change, Vitrified clay pipe135.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start168.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start168.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start170.6 ft. MWM - Water Mark, 20 %of cross sectional area170.6 ft. AMH - Downstream Manhole, Survey Begins - 32 1165170.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK170.6 ft. MWL - Water Level, 10 %of cross sectional area

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    69.2 ft. - Material Change, Vitrified clay pipe

Observations (13)

DistanceCodeObservation
0MWM
2SAP
2DAGS
0AMH32 1165
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWL
2SSS
69.2SAP
69.2SSS
35.4TFC
168.5DAGS
170.6AMH32 1166
69.2MMC

Properties (6)

additional_info
SC378334
custom_field_two
2
customer
LACSD
datetime
2019-08-16T01:22:26-07:00
documentation
PRO PIPE
is_lateral_inspection
false