Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2019, 08:08 AM
  • 32 1165_32 1164_08162019_011945.mp4

Date
08/16/2019
W/O
782269
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19619
Time
1:08 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6864
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782269_TV32021_AUG2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1164
Downstream MH
32 1165
Dir. of Survey
Upstream
Length Surveyed
279.5 ft.
Total Length
279.5 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
275
O&M Index
2
O&M Quick
2J00
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
385
Pipe schematic from manhole 32 1164 to 32 1165
MH: 32 1164MH: 32 1165upstream0 ft. AMH - Upstream Manhole, Survey Ends - 32 11650 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK1.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish220 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"277.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start277.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start277.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start279.5 ft. MWM - Water Mark, 20 %of cross sectional area279.5 ft. MWL - Water Level, 10 %of cross sectional area279.5 ft. AMH - Downstream Manhole, Survey Begins - 32 1164

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
277.8DAGS
277.8SSS
2SAP
2SSS
279.5AMH32 1165
0MWM
0MWL
59.5TFC
279.5MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH32 1164
2DAGS
277.8SAP

Properties (6)

additional_info
SC378334
custom_field_two
2
customer
LACSD
datetime
2019-08-16T01:08:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false