Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2019, 08:41 AM
  • 32 1164_32 1163_08162019_015548.mp4

Date
08/16/2019
W/O
782269
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19618
Time
1:41 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6864
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782269_TV32021_AUG2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1164
Downstream MH
32 1163
Dir. of Survey
Downstream
Length Surveyed
447 ft.
Total Length
447 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
445
O&M Index
2
O&M Quick
2Q00
O&M Rating
178
Overall Index
2
Overall Quick
Overall Rating
623
Pipe schematic from manhole 32 1164 to 32 1163
MH: 32 1164MH: 32 1163downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 11642 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start189 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"431.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"444.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish444.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish444.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish447 ft. AMH - Downstream Manhole, Survey Ends - 32 1163

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
431.3TFC
444.9SSS
447AMH32 1163
444.9DAGS
0MWL
2SSS
444.9SAP
0MWM
189TFC
2SAP
2DAGS
0AMH32 1164

Properties (6)

additional_info
SC378334
custom_field_two
2
customer
LACSD
datetime
2019-08-16T01:41:26-07:00
documentation
PRO PIPE
is_lateral_inspection
false