Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 16, 2019, 05:57 PM
  • F 0080_F 0079_16082019_112927.mp4

Date
08/16/2019
W/O
771934
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00043
PipeID
P10284
Time
10:57 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6784
Sewer Name
F JOINT OUTFALL F - UNIT 7A
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_771934_TV02203_JUN2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Width
60 in.
Upstream MH
F 0080
Downstream MH
F 0079
Dir. of Survey
Downstream
Length Surveyed
707.6 ft.
Total Length
707.6 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole F 0080 to F 0079
MH: F 0080MH: F 0079downstream0 ft. AMH - Upstream Manhole, Survey Begins - F 00800 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. MGO - General Observation - MAGNEZIUM H.O COATING THROUGHOUT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start160.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"699 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish707.6 ft. AMH - Downstream Manhole, Survey Ends - F 0079

Observation photos (4)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • General Observation - MAGNEZIUM H.O COATING THROUGHOUT

    2 ft. - General Observation - MAGNEZIUM H.O COATING THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    160.7 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (9)

DistanceCodeObservation
707.6AMHF 0079
2MGOMAGNEZIUM H.O COATING THROUGHOUT
0AMHF 0080
0MGOCOCKROACHES IN MANHOLE
699SAP
2SAP
0MWL
160.7TBA
0MWM

Properties (6)

additional_info
SC378290
custom_field_two
3
customer
LACSD
datetime
2019-08-16T10:57:47-07:00
documentation
PRO PIPE
is_lateral_inspection
false