Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2019, 10:18 AM
  • 02 0210_02 0209 _08122019_033529.mp4

Date
08/12/2019
W/O
782708
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00251
PipeID
P04543
Time
3:18 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6742
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
DOWNEY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
30
Purpose
Routine Assessment
Project
RFIR_WO_782708_TV02382_AUG2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0210
Downstream MH
02 0209
Dir. of Survey
Downstream
Length Surveyed
378.7 ft.
Total Length
378.7 ft.
Structural Index
3
Structural Quick
413N
Structural Rating
226
O&M Index
2
O&M Quick
2N00
O&M Rating
148
Overall Index
3
Overall Quick
Overall Rating
374
Pipe schematic from manhole 02 0210 to 02 0209
MH: 02 0210MH: 02 0209downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 02100 ft. MWL - Water Level, 10 %of cross sectional area5.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start38.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"49.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"198.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES240.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: NO, 6"262.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"269 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"346.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"369.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"376.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish376.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish378.6 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK378.7 ft. AMH - Downstream Manhole, Survey Ends - 02 0209

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    5.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    198.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
0MWM
49.7TF
378.7AMH02 0209
262.7TFC
376.4DAGS
376.4CM
0AMH02 0210
0MWL
378.6MGOCONNECTION AT MH 9 OCLOCK
269TF
5.5DAGS
240.8TF
346.6TFC
38.4TF
5.5CM
369.1TFC
198.2FM

Properties (6)

additional_info
SC378241
custom_field_two
3
customer
LACSD
datetime
2019-08-12T03:18:44-07:00
documentation
PROPIPE
is_lateral_inspection
false