Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2019, 10:22 AM
  • 32 0168_32 0167_08262019_033733.mp4

Date
08/26/2019
W/O
782251
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00891
PipeID
P19919
Time
3:22 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6881
Sewer Name
32 VALENCIA TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_782251_TV32044_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
32 0168
Downstream MH
32 0167
Dir. of Survey
Downstream
Length Surveyed
333.5 ft.
Total Length
333.5 ft.
Structural Index
3
Structural Quick
5L3L
Structural Rating
660
O&M Index
2
O&M Quick
412L
O&M Rating
136
Overall Index
3
Overall Quick
Overall Rating
796
Pipe schematic from manhole 32 0168 to 32 0167
MH: 32 0168MH: 32 0167downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 01682 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start59.3 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"311.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"331.5 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish331.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish331.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish331.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish333.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK333.5 ft. AMH - Downstream Manhole, Survey Ends - 32 0167

Observation photos (5)

  • Upstream Manhole, Survey Begins - 32 0168

    0 ft. - Upstream Manhole, Survey Begins - 32 0168

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
59.3TBA
0MWM
311.1TBA
2DAGS
333.5AMH32 0167
331.5SRV
331.5DAGS
331.5SAP
0MWL
2SSS
331.5SSS
333.3MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0AMH32 0168
2SAP
2SRV

Properties (7)

additional_info
SC386985
custom_field_two
2
customer
LACSD
datetime
2019-08-26T03:22:40-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26793