Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 20, 2019, 09:44 AM
  • 32 0229_32 0163_08202019_024909.mp4

Date
08/20/2019
W/O
782251
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00891
PipeID
P19915
Time
2:44 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6871
Sewer Name
32 VALENCIA TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_782251_TV32044_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
32 0229
Downstream MH
32 0163
Dir. of Survey
Downstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 32 0229 to 32 0163
MH: 32 0229MH: 32 0163downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 02292 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES2 ft. AMH - Downstream Manhole, Survey Ends - 32 01632 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

Observation photos (5)

  • Upstream Manhole, Survey Begins - 32 0229

    0 ft. - Upstream Manhole, Survey Begins - 32 0229

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

  • Downstream Manhole, Survey Ends - 32 0163

    2 ft. - Downstream Manhole, Survey Ends - 32 0163

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
2DAGS
2AMH32 0163
0MWM
0MWL
2SSS
0AMH32 0229
2SAP

Properties (7)

additional_info
SC378341
custom_field_two
3
customer
LACSD
datetime
2019-08-20T02:44:28-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26793