Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 31, 2019, 05:37 AM
  • 22 1084_22 1083 _30072019_231041.mp4

Date
07/30/2019
W/O
777331
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00812
PipeID
P17457
Time
10:37 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6727
Sewer Name
22 IRWINDALE TRUNK, SECTS 2,3,4,&5
City
IRWINDALE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
10
Purpose
Routine Assessment
Project
WO_777331_TV22042_JUL2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 1084
Downstream MH
22 1083
Dir. of Survey
Downstream
Length Surveyed
351.8 ft.
Total Length
351.8 ft.
Structural Index
3
Structural Quick
4D3H
Structural Rating
385
O&M Index
2
O&M Quick
2M00
O&M Rating
142
Overall Index
2
Overall Quick
Overall Rating
527
Pipe schematic from manhole 22 1084 to 22 1083
MH: 22 1084MH: 22 1083downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 10842 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start6.7 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start7.7 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1" - OPEN49 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"61.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN116.9 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6" - OPEN119.8 ft. FM - Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES126.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"139.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.5 ft. FS - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES148.3 ft. MGO - General Observation - NO MH AT 147FT197.7 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"210.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"211.9 ft. FS - Fracture Spiral, from 02 to 10 o'clock, within 8 inches of joint: YES227.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES232.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start232.7 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish283.9 ft. MGO - General Observation - UNMAPPED MH 22 1083A284.9 ft. MGO - General Observation - CONN 3 O' CLOCK AT MH/OPEN290.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN308.2 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6" - OPEN340.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start340.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish350 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH/UNKNOWN351 ft. MGO - General Observation - CONN 3 O'CLOCK @ MH/UNKNOWN351.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish351.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351.8 ft. AMH - Downstream Manhole, Survey Begins - 22 1083

Observation photos (9)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    6.7 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1" - OPEN

    7.7 ft. - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: NO, 6", 1" - OPEN

  • Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES

    119.8 ft. - Fracture Multiple, from 07 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

    145.5 ft. - Fracture Spiral, from 07 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 02 to 10 o'clock, within 8 inches of joint: YES

    211.9 ft. - Fracture Spiral, from 02 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    227.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    232.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    340.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (33)

DistanceCodeObservation
119.8FM
2.3DAGS
340.1DAGS
308.2TBOPEN
232.7FM
61.8TFOPEN
210.7TFC
351.8DAGS
211.9FS
351.8FM
116.9TBOPEN
148.3MGONO MH AT 147FT
351.8AMH22 1083
351MGOCONN 9 O'CLOCK @ MH/UNKNOWN
139.1TFC
284.9MGOCONN 3 O' CLOCK AT MH/OPEN
6.7CM
145.5FS
351MGOCONN 3 O'CLOCK @ MH/UNKNOWN
227.4FM
49TFC
126.2TFC
7.7TBIOPEN
350SSS
0MWL
283.9MGOUNMAPPED MH 22 1083A
2SSS
0MWM
197.7TBA
290.5TFOPEN
0AMH22 1084
232.7CM
340.1DAGS

Properties (6)

additional_info
SC378226
custom_field_two
2
customer
LACSD
datetime
2019-07-30T22:37:55-07:00
documentation
PROPIPE
is_lateral_inspection
false