05 1804A_05 1804 _08192019_232558.mp4

0 ft. - Upstream Manhole, Survey Begins - 05 1804A
2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
18.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
31.6 ft. - Roots Medium Barrell, from 08 to 04 o'clock, 25 %, within 8 inches of joint: YES, Start
59.6 ft. - Roots Ball Lateral, from 07 to 04 o'clock, 75 %
61.8 ft. - Roots Fine Barrell, from 08 to 04 o'clock, Start
75.6 ft. - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 2.3 | DAGS | — |
| 31.6 | RMB | — |
| 86 | DAGS | — |
| 59.6 | RBL | — |
| 18.4 | CM | — |
| 0 | AMH | 05 1804A |
| 59.6 | TBA | — |
| 75.6 | FS | — |
| 0 | MGO | CONNECTION AT MH 9 OCLOCK |
| 86 | RFB | — |
| 0 | MWL | — |
| 18 | DAE | — |
| 87.7 | AMH | 05 1804 |
| 0 | MWM | — |
| 35 | RMB | — |
| 86 | CM | — |
| 61.8 | RFB | — |