Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 26, 2016, 08:00 AM
  • 20 0262_20 0261_10262016_010115.mp4

Date
10/26/2016
W/O
597309
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00753
PipeID
P19229
Time
1:00 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3793
Sewer Name
20 35TH STREET EAST TRUNK
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
13
Purpose
Routine Assessment
Project
WO_597309_TV20009_OCT2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
20 0262
Downstream MH
20 0261
Dir. of Survey
Downstream
Length Surveyed
333.4 ft.
Total Length
333.4 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
198
O&M Index
2
O&M Quick
412L
O&M Rating
136
Overall Index
3
Overall Quick
Overall Rating
334
Pipe schematic from manhole 20 0262 to 20 0261
MH: 20 0262MH: 20 0261downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 20 02620 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start5.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"53.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"106.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"153.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"253.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"304.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"331.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish331.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish333.4 ft. AMH - Downstream Manhole, Survey Ends - 20 0261

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    5.9 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (16)

DistanceCodeObservation
331.5DAGS
205.8TFC
5.9TFC
2SAP
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
333.4AMH20 0261
2DAGS
153.9TFC
253.6TFC
106.3TFC
0MWM
331.5SAP
304.9TFC
0AMH20 0262
0MWL
53.9TFC

Properties (6)

additional_info
SC306331
custom_field_two
3
customer
LACSD
datetime
2016-10-26T01:00:18-07:00
documentation
PRO PIPE
is_lateral_inspection
false