Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 4, 2016, 08:49 AM
  • 18 0083_18 0082 _04102016_020657.mp4

Date
10/04/2016
W/O
597011
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00698
PipeID
P13902
Time
1:49 AM
Certificate
U-507-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3729
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_597011_TV18083_OCT2016
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0083
Downstream MH
18 0082
Dir. of Survey
Downstream
Length Surveyed
387.6 ft.
Total Length
387.6 ft.
Structural Index
2
Structural Quick
322N
Structural Rating
160
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
164
Pipe schematic from manhole 18 0083 to 18 0082
MH: 18 0083MH: 18 0082downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 00830 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start16.3 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"103.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"153 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"247.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"249.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"307.6 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"384.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish384.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish385 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish387.6 ft. MGO - General Observation - CONNECTION AT MH 9 ACTIVE387.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0082

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
384.8DAGS
103.6TFA
2.1DAGS
2.1SSS
307.6TFA
387.6MGOCONNECTION AT MH 9 ACTIVE
0AMH18 0083
153TFC
387.6AMH18 0082
0MWL
0MWM
247.7TFA
384.8SSS
16.3TFA
249.7TFC
2SAV
385SAV

Properties (6)

additional_info
SC303716
custom_field_two
2
customer
LACSD
datetime
2016-10-04T01:49:09-07:00
documentation
PRO-PIPE
is_lateral_inspection
false