Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 1, 2017, 06:49 AM
  • 01 1083_01 1082_28022017_224918.mp4

Date
02/28/2017
W/O
619125
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00210
PipeID
P01932
Time
10:49 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
4362
Sewer Name
01 HUNTINGTON PARK TRUNK
City
CUDAHY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
WO_619125_TV01246_FEB2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
01 1083
Downstream MH
01 1082
Dir. of Survey
Downstream
Length Surveyed
139.6 ft.
Total Length
139.6 ft.
Structural Index
3
Structural Quick
3E21
Structural Rating
86
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
89
Pipe schematic from manhole 01 1083 to 01 1082
MH: 01 1083MH: 01 1082downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 10830 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2.8 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES5.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start136.5 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start139.6 ft. JOL - Joint Offset Large139.6 ft. MSA - Survey Abandoned - CAM BLKD BY DEBRIS / LARGE OFFSET JOINT139.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish139.6 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (4)

  • Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

    2.8 ft. - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.4 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  20 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    136.5 ft. - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Joint Offset Large

    139.6 ft. - Joint Offset Large

Observations (10)

DistanceCodeObservation
139.6JOL
5.4CM
136.5DSZ
139.6MSACAM BLKD BY DEBRIS / LARGE OFFSET JOINT
139.6CM
0AMH01 1083
0MWL
2.8CM
139.6DSZ
0MWM

Properties (6)

additional_info
SC306874
custom_field_two
5
customer
LACSD
datetime
2017-02-28T22:49:03-08:00
documentation
PROPIPE
is_lateral_inspection
false