Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 11, 2016, 05:21 AM
  • 02 1384_02 1383_10102016_230151.mp4

Date
10/10/2016
W/O
597385
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00245
PipeID
P03904
Time
10:21 PM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3427
Sewer Name
02 DITMAN STREET BRANCH TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
07A
Purpose
Routine Assessment
Project
WO_597385_TV02045_OCT2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
02 1384
Downstream MH
02 1383
Dir. of Survey
Downstream
Length Surveyed
355 ft.
Total Length
355 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
1
Overall Quick
Overall Rating
1
Pipe schematic from manhole 02 1384 to 02 1383
MH: 02 1384MH: 02 1383downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 ACTIVE0 ft. MGO - General Observation - CONNECTION AT MH 9 ACTIVE0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 02 13840 ft. MWL - Water Level, 5 %of cross sectional area0.1 ft. MWM - Water Mark, 20 %of cross sectional area83.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"98.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"119.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"176.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"183.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"203.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"205.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"278 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"296.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"355 ft. AMH - Downstream Manhole, Survey Ends - 02 1383

Observations (16)

DistanceCodeObservation
296.3TF
83.4TF
203.1TF
98.9TF
0.1MWM
0MGOCONNECTION AT MH 3 ACTIVE
0MGOCONNECTION AT MH 9 ACTIVE
0VC
278TF
176.9TF
0AMH02 1384
355AMH02 1383
0MWL
205.8TF
119.9TF
183.5TF

Properties (8)

additional_info
SC303461
custom_field_two
4
customer
LACSD
datetime
2016-10-10T22:21:28-07:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
PVCP-Folded/Reformed
year_laid
38394