Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 1, 2018, 05:00 AM
  • C 0295_C 0294 _30042018_221051.mp4

Date
04/30/2018
W/O
696324
Weather
Dry
Operator/Surveyor
B FUGATE
Sewer ID
Z00134
PipeID
P09755
Time
10:00 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5548
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
WO_696324_TV19035_APR2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
C 0295
Downstream MH
C 0294
Dir. of Survey
Downstream
Length Surveyed
148.3 ft.
Total Length
148.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole C 0295 to C 0294
MH: C 0295MH: C 0294downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 02950 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CAPPED CONNECTION AT 9 O' CLOCK AT2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. MGO - General Observation - MAG COAT2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start123.5 ft. DAE - Deposits Attached Encrustation, 20 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: NO123.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"132.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.3 ft. AMH - Downstream Manhole, Survey Ends - C 0294148.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish148.3 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH148.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish148.3 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 20 %of cross sectional area, from 02 to 05 o'clock,  , within 8 inches of joint: NO

    123.5 ft. - Deposits Attached Encrustation, 20 %of cross sectional area, from 02 to 05 o'clock, , within 8 inches of joint: NO

Observations (15)

DistanceCodeObservation
2.9SSS
148.3AMHC 0294
2.9MGOMAG COAT
132.6TFC
123.5DAE
0MWL
148.3SSS
2.9SAP
0AMHC 0295
148.3MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
148.3SAP
148.3MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
123.5TFC
0MWM
0MGOCAPPED CONNECTION AT 9 O' CLOCK AT

Properties (6)

additional_info
SC359304
custom_field_two
3
customer
LACSD
datetime
2018-04-30T22:00:14-07:00
documentation
PROPIPE
is_lateral_inspection
false