Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 1, 2018, 04:39 AM
  • C 0297_C 0296 _30042018_215216.mp4

Date
04/30/2018
W/O
696324
Weather
Dry
Operator/Surveyor
B FUGATE
Sewer ID
Z00134
PipeID
P09757
Time
9:39 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5548
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
WO_696324_TV19035_APR2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
C 0297
Downstream MH
C 0296
Dir. of Survey
Downstream
Length Surveyed
250.4 ft.
Total Length
250.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole C 0297 to C 0296
MH: C 0297MH: C 0296downstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 02970 ft. MWL - Water Level, 25 %of cross sectional area2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start41.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"42.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"50 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"89.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"137.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"193.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"201.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"241.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"247.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish247.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish250.4 ft. AMH - Downstream Manhole, Survey Ends - C 0296250.4 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2.1SSS
201.8TFC
241.4TFC
145.5TFC
247.8SAP
97.9TFC
137.4TFC
250.4AMHC 0296
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
247.8SSS
41.9TFC
250.4MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
0MWM
89.6TFC
2.2SAP
42.7TF
0AMHC 0297
0MWL
50TFC
193.4TFC

Properties (6)

additional_info
SC359304
custom_field_two
3
customer
LACSD
datetime
2018-04-30T21:39:31-07:00
documentation
PROPIPE
is_lateral_inspection
false