Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 30, 2018, 09:49 AM
  • C 0303_C 0302 _30042018_033931.mp4

Date
04/30/2018
W/O
696324
Weather
Dry
Operator/Surveyor
B FUGATE
Sewer ID
Z00134
PipeID
P09763
Time
2:49 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5545
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
WO_696324_TV19035_APR2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
C 0303
Downstream MH
C 0302
Dir. of Survey
Downstream
Length Surveyed
287.5 ft.
Total Length
287.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
4
Overall Quick
Overall Rating
8
Pipe schematic from manhole C 0303 to C 0302
MH: C 0303MH: C 0302downstream0 ft. AMH - Upstream Manhole, Survey Begins - C 03030 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.1 ft. DAGS - Deposits Attached Grease, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start10.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"27.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"67 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"74.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"107.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"130.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"131.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"146.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"155 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"194.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"202.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"250.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"258.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"287.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish287.5 ft. AMH - Downstream Manhole, Survey Ends - C 0302287.5 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH287.5 ft. DAGS - Deposits Attached Grease, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (2)

  • Deposits Attached Grease, 40 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
155TFC
0AMHC 0303
287.5SAP
0MWM
74.8TFC
287.5AMHC 0302
146.9TFC
287.5MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
99.2TFC
2.1DAGS
287.5DAGS
194.8TFC
202.9TFC
27.3TFC
130.7TFA
67TFC
19TFC
107.2TFC
0MWL
250.5TFC
131.6TFA
10.7SAP
258.4TFC

Properties (6)

additional_info
SC359303
custom_field_two
3
customer
LACSD
datetime
2018-04-30T02:49:22-07:00
documentation
PROPIPE
is_lateral_inspection
false