Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 1, 2018, 05:23 AM
  • C 0293_C 0292 _30042018_223410.mp4

Date
04/30/2018
W/O
696324
Weather
Dry
Operator/Surveyor
B FUGATE
Sewer ID
Z00134
PipeID
P09753
Time
10:23 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5548
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
Routine Assessment
Project
WO_696324_TV19035_APR2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
C 0293
Downstream MH
C 0292
Dir. of Survey
Downstream
Length Surveyed
195.2 ft.
Total Length
195.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole C 0293 to C 0292
MH: C 0293MH: C 0292downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - C 02933 ft. MGO - General Observation - MAG COAT3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"44.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"91.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"187.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"195.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish195.2 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH195.2 ft. AMH - Downstream Manhole, Survey Ends - C 0292195.2 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH195.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
195.2MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
195.1SAP
187.4TFC
44.3TFC
91.5TF
195.2AMHC 0292
99.5TFC
0MWM
195.2MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
0MWL
3MGOMAG COAT
3SSS
3SAP
195.2SSS
0AMHC 0293
35.5TF

Properties (6)

additional_info
SC359304
custom_field_two
4
customer
LACSD
datetime
2018-04-30T22:23:54-07:00
documentation
PROPIPE
is_lateral_inspection
false