Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 3, 2018, 09:14 AM
  • B 1499_B 1098 _03052018_024351.mp4

Date
05/03/2018
W/O
695753
Weather
Dry
Operator/Surveyor
K. ADAME
Sewer ID
Z01124
PipeID
P13724
Time
2:14 AM
Certificate
U-0817-07009000
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5607
Sewer Name
B JOINT OUTFALL B - UNIT 6G
City
ALHAMBRA, CA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
23
Purpose
Routine Assessment
Project
WO_695753_TV16101_APR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
B 1499
Downstream MH
B 1098
Dir. of Survey
Downstream
Length Surveyed
491 ft.
Total Length
491 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole B 1499 to B 1098
MH: B 1499MH: B 1098downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 14990 ft. MWM - Water Mark, 50 %of cross sectional area14.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start157.3 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"255.7 ft. MGO - General Observation - MAG COAT487.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish491 ft. AMH - Downstream Manhole, Survey Ends - B 1098

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    14.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • General Observation - MAG COAT

    255.7 ft. - General Observation - MAG COAT

Observations (8)

DistanceCodeObservation
0MWL
487.2SAP
157.3TB
0AMHB 1499
14.4SAP
255.7MGOMAG COAT
0MWM
491AMHB 1098

Properties (6)

additional_info
SC359159
custom_field_two
3
customer
LACSD
datetime
2018-05-03T02:14:18-07:00
documentation
PRO-PIPE
is_lateral_inspection
false