Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 2, 2018, 06:18 AM
  • 01 1201_01 1200_01052018_233717.mp4

Date
05/01/2018
W/O
695748
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00226
PipeID
P02112
Time
11:18 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5550
Sewer Name
01 WILCOX AVENUE TRUNK, EXTENSION #1
City
CUDAHY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Routine Assessment
Project
WO_695748_TV01206_APR2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
01 1201
Downstream MH
01 1200
Dir. of Survey
Downstream
Length Surveyed
488.3 ft.
Total Length
488.3 ft.
Structural Index
3
Structural Quick
3400
Structural Rating
12
O&M Index
4
O&M Quick
4131
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
19
Pipe schematic from manhole 01 1201 to 01 1200
MH: 01 1201MH: 01 1200downstream0 ft. AMH - Upstream Manhole, Survey Begins - UNMAPPED MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. MWM - Water Mark, 30 %of cross sectional area2.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"83.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.7 ft. RBL - Roots Ball Lateral, at 10 o'clock, 70 %, within 8 inches of joint: NO - INSIDE THE LATERAL168.7 ft. RMC - Roots Medium Connection, from 08 to 10 o'clock, 25 %, within 8 inches of joint: YES168.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"180.6 ft. MGO - General Observation - AT MH 01 1201 STARTED AT UN MAPPED MH196.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"218.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start257.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"488.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish488.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish488.3 ft. AMH - Downstream Manhole, Survey Ends - 01 1200488.3 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH

Observation photos (3)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Connection, from 08 to 10 o'clock, 25 %, within 8 inches of joint: YES

    168.7 ft. - Roots Medium Connection, from 08 to 10 o'clock, 25 %, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    218.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
180.6MGOAT MH 01 1201 STARTED AT UN MAPPED MH
28.8TFC
488.3FL
488.3CM
218.1FL
196.1TFC
168.7RBLINSIDE THE LATERAL
0AMHUNMAPPED MH
488.3AMH01 1200
0MWL
2.9CM
168.7RMC
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
83.8TFC
0MWM
168.7TF
257.1TFC
488.3MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH

Properties (6)

additional_info
SC359306
custom_field_two
3
customer
LACSD
datetime
2018-05-01T23:18:21-07:00
documentation
PROPIPE
is_lateral_inspection
false