Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 26, 2018, 06:46 AM
  • 15 0879_15 0878 _25042018_235721.mp4

Date
04/25/2018
W/O
695662
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00599
PipeID
P12672
Time
11:46 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5577
Sewer Name
15 CALIFORNIA AVENUE TRUNK
City
MONROVIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
05
Purpose
Routine Assessment
Project
WO_695662_TV15182_APR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0879
Downstream MH
15 0878
Dir. of Survey
Downstream
Length Surveyed
82.7 ft.
Total Length
82.7 ft.
Structural Index
3
Structural Quick
3B00
Structural Rating
48
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
48
Pipe schematic from manhole 15 0879 to 15 0878
MH: 15 0879MH: 15 0878downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 15 08790 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start82.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 10 O'CLOCK82.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish82.7 ft. AMH - Downstream Manhole, Survey Ends - 15 0878

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
82.7MGOACTIVE CONNECTION AT MH 10 O'CLOCK
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
0AMH15 0879
0MWM
0MWL
2SAP
82.7SAP
82.7AMH15 0878

Properties (6)

additional_info
SC358537
custom_field_two
2
customer
LACSD
datetime
2018-04-25T23:46:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false