Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 10, 2019, 05:16 AM
  • 02 1159_02 1158_04092019_223535.mp4

Date
04/09/2019
W/O
761209
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00351
PipeID
P02943
Time
10:16 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5924
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_761209_TV02318_APR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
02 1159
Downstream MH
02 1158
Dir. of Survey
Downstream
Length Surveyed
244.4 ft.
Total Length
244.4 ft.
Structural Index
4
Structural Quick
4F32
Structural Rating
138
O&M Index
2
O&M Quick
412I
O&M Rating
102
Overall Index
3
Overall Quick
Overall Rating
240
Pipe schematic from manhole 02 1159 to 02 1158
MH: 02 1159MH: 02 1158downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 11591 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start52.1 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES73.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES76.4 ft. FS - Fracture Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES80.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"82.1 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES85.3 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start128.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"177.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"228.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"239.1 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish244 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish244.4 ft. AMH - Downstream Manhole, Survey Ends - 02 1158

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    73.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES

    76.4 ft. - Fracture Spiral, from 07 to 09 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    82.1 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    85.3 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
73.5CM
85.3FM
244.4AMH02 1158
228.9TFC
239.1FM
80.7TFC
244DAGS
0MWM
76.4FS
128.7TFC
0MWL
177.1TFC
1DAGS
82.1FM
0AMH02 1159
52.1FM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-04-09T22:16:36-07:00
documentation
PRO PIPE
is_lateral_inspection
false