Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2019, 05:36 AM
  • 02 1126_02 1125_04082019_225843.mp4

Date
04/08/2019
W/O
761209
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00351
PipeID
P02906
Time
10:36 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6516
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_761209_TV02318_APR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1126
Downstream MH
02 1125
Dir. of Survey
Downstream
Length Surveyed
268.4 ft.
Total Length
268.4 ft.
Structural Index
4
Structural Quick
4200
Structural Rating
8
O&M Index
2
O&M Quick
412J
O&M Rating
110
Overall Index
2
Overall Quick
Overall Rating
118
Pipe schematic from manhole 02 1126 to 02 1125
MH: 02 1126MH: 02 1125downstream0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 11261 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start9.2 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start42.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"77.1 ft. FM - Fracture Multiple, from 12 to 03 o'clock, within 8 inches of joint: YES94.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"145.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"197.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"244.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"265.8 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish268 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish268.4 ft. AMH - Downstream Manhole, Survey Ends - 02 1125

Observation photos (1)

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    9.2 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
145.6TFC
244.5TFC
0MWL
0MWM
268DAGS
1DAGS
268.4AMH02 1125
0AMH02 1126
265.8FM
77.1FM
197.2TFC
42.8TFC
94.9TFC
9.2FM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-04-08T22:36:32-07:00
documentation
PROPIPE
is_lateral_inspection
false